Park connector network - Park Connector Information. Location. Old Upper Thomson PC runs through the perimeter of Old Upper Thomson Road. It starts near Casuarina Carpark until the end of Old Upper Thomson Road. Length of Park Connector. 3 km. Lighting Hours. 7.00pm-7.00am.

 
Park Connector Information. Location. Mandai Park Connector starts at Lentor Ave and runs along Yishun Ave 1/Mandai Ave/ Mandai Road before ending at Junction of Mandai Lake Road. Length of Park Connector. 5 km. Lighting Hours. 7.00pm-7.00am.. Lax to sal

Park Connector Information. Location. Tampines Loyang Park Connector starts at Tampines Street 34 and runs along Tampines Ave 7 and Loyang Avenue before ending at the junction of Loyang Avenue and Pasir Ris Drive 3. Length of Park Connector. 1.8km. Bus Service. 9, 19, 59, 359 (Blk 275 (98021) bus stop)Simei Park Connector. Linked to a part of Tampines Park Connector by an overhead bridge, Simei Park Connector stretches along Simei estate, passing through Simei MRT via the track viaducts and ends at the intersection of Bedok Park Connector located at Upper Changi Road East. It also runs along ITE College East and Singapore Expo, …Park Connector Information. Location. Whampoa Park Connector starts at Jalan Rajah, across Toa Payoh Town Park and runs along Sungei Whampoa before ending at Bendemeer Road. Length of Park Connector. 4.49 km. Accessibility. The park connector is barrier free, however, users will have to cross two pedestrian overhead bridges over …5 Serangoon Park Connector 4.2 km 5 Hougang Ave 3 Park Connector 4.4 km 6 Jln Pelikat Park Connector 1.5 km 7 Paya Lebar Park Connector 0.7 km 8 Balam Park Connector 1.2 km 9 Pelton Canal Park Connector 2.5 km 10 Whampoa Park Connector 4.5 km 11 Kallang Park Connector 7.9 km 12 Bishan-Ang Mo Kio Park 1.5 km Discover …In all, more than $315 million will be committed to develop the new routes and other projects to expand and enhance parks and the Park Connector Network (PCN) - $80 million on park development ...Lifestyle. 5 Park Connector Loops In Singapore That You Must Check Out. 8 min read. We take a look at the park connector network in Singapore that brings easy access to …Park Connector Network - NParks webpage The NParks webpage was revamped recently and the park connectors are found under the Visitor's Guide here. It lacks a satellite view but at least its up there as a reference. In January, Singeo provided NParks map overlays on Google Earth which you can download.In all, more than $315 million will be committed to develop the new routes and other projects to expand and enhance parks and the Park Connector Network (PCN) - $80 million on … Ang Mo Kio Park Connector starts at Ang Mo Kio Ave 1 and runs along Ang Mo Kio Ave 6 before ending at Ang Mo Kio St 12. Length of Park Connector. 1.08 km. Accessibility. Wheelchair accessible. Bus Service. 13, 86, 138, 138A, 138B, 162, 162M, 851, 851e, 852, 853, 853M (Bus stop opp Courts AMK) Get Directions. The Coast-to-Coast Trail (Central) is a 36 km trail that spans across Singapore, linking up nature areas, parks and park connectors from Jurong Lake Gardens in the west, the new Lornie Nature Corridor near the centre, and to Coney Island Park in the northeast. You can choose to explore the Trail on your own using the NParks Explore a Route ... Park Connector. Nature lovers will delight in the Hawker Centre rich biodiversity along the route, such as the Grey via Pelton Canal Park Connector Continue along the Pelton …Nparks PCN goal was to develop a 300km island-wide network of green corridors by FY2015. And NParks had finished about 112 km of park connectors in 2009. The main PC, The Western Loop, was ... Simei Park Connector Simpang Kiri Park Connector Springleaf Park Connector Stadium Park Connector Sun Plaza Park Sungei Serangoon Park Connector Tampines-Loyang Park Connector Tampines Park Connector Tanjong Rhu Promenade Tiong Bahru Park Toa Payoh Town Park Ulu Pandan (PIE-AYE) & Ulu Pandan (Bukit Batok East-PIE) Park Connector Ulu Sembawang ... The Coast-to-Coast Trail (Central) is a 36 km trail that spans across Singapore, linking up nature areas, parks and park connectors from Jurong Lake Gardens in the west, the new Lornie Nature Corridor near the centre, and to Coney Island Park in the northeast. You can choose to explore the Trail on your own using the NParks Explore a Route ... Park Connector Information. Location. Choa Chu Kang Park Connector starts at Choa Chu Kang Drive. It runs along Choa Chu Kang Ave 4, Ave 1, Ave 3, Brickland Rd and ends at Bukit Batok West Ave 5. Length of Park Connector. 5.4 km. … The Round Island Route (RIR), a continuous 150km park connector, is part of NParks’ overall plans to curate a 360km island-wide network of recreational routes comprising park connectors and trails. When completed, the Round Island Route will be the longest recreational connection in this network. Park Connector Information. Location. Khatib Bongsu Park Connector starts at Yishun Ave 1/ Yishun Ave 2 and runs along Yishun Central and Yishun Ring Road before ending at Yishun Ave 6. Length of Park Connector. 4.5 km.Sims Avenue PC. Sims Avenue Park Connector connects the cycling routes of the eastern parts of Singapore to the central area. It comes close to Geylang Park Connector which links to Tanjong Rhu Promenade, allowing visits to attractions such as Singapore Sports Hub and Gardens by the Bay. It also connects to Siglap Park Connector, which is ...And the Park Connector Network (PCN) brings all of these together in the most splendid way possible. First opened in 1995, the park connector in Singapore is essentially a system that connects the ...The nature park network, which currently covers 350ha, ... Currently, Singapore has 340km of park connectors islandwide. This will be upped to 500km by 2030. With this, ...The Park Connector Network has also benefitted wildlife. Surveys of various Park Connectors have turned up a total of 90 species of birds, including the White-throated Kingfisher, Grey Heron and Scaly Breasted Munia; 57 species of butterflies like the Common Mime; and 22 species of dragonflies.Park Connector Information. Location. Choa Chu Kang Park Connector starts at Choa Chu Kang Drive. It runs along Choa Chu Kang Ave 4, Ave 1, Ave 3, Brickland Rd and ends at Bukit Batok West Ave 5. Length of Park Connector. 5.4 km. …Coastal Park Connector starts from Changi Beach Park Car Park 7 and ends at East Coast Park. This 15km park connector runs along Aviation Park Road and Tanah Merah Coast Road, alongside the future Changi Airport Runway 3 and Terminal 5. At the East Coast Park towards Coastal Park Connector next to Changi Coast Walk, you can take …Park Connector Information. Location. Yishun Park Connector starts at Yishun Central and runs along Yishun Ave 2 before ending at Canberra Link. Length of Park Connector. 3 km. Lighting Hours. 7.00pm-7.00am.he Park Connector Network is an innovative programme that allows busy Singaporeans to enjoy the outdoors more. Developed by the National Parks Board in cooperation with …Park Connector. Nature lovers will delight in the Hawker Centre rich biodiversity along the route, such as the Grey via Pelton Canal Park Connector Continue along the Pelton …3 Ulu sembawang Park Connector This rustic stretch surrounded by wilderness, including a variety of fruit trees from Singapore’s kampong days, invokes memories of days gone by. The hilly terrain and off-road conditions add character and value to this beautiful park connector. 4 woodlands (sLe) Park Connector A stretch that cuts across the top ...PDF | On Dec 17, 2018, Ye Zhang and others published Measuring the physical profile and use of Park Connector Network in Singapore using deep learning and big data analytics. | Find, read and cite ...NParks Park Connector Network. Recreational Connectivity. Know Our Recreational Connectivity. Island-wide Routes. Coast to Coast Trail. Eastern Corridor. Rail Corridor. Round Island Route. The Park Connector Experience. Park Connector Network. Explore Park Connectors. NParks Explore A Route Mobile App.1. Why is NParks revising the typology for the Park Connector Network (PCN)? Since the implementation of the Active Mobility Act in 2018, we have received feedback on the typology (imprints and icons) along our PCN and parks. Hence, we have refined the existing signs and imprints onsite for better clarity, so that users can have a saferNational Parks Board (NParks)Changi Bay Park Connector forms part of the eastern corridor of the Round-Island-Route. At 3.6km long, it connects Changi Beach Park to the East Coastal Park Connector Network. Completed and opened to the public in January 2022, it offers a scenic coastal route for cyclists and hikers who travel from East Coast Park to Changi Beach Park.>. The Round Island Route (RIR), a continuous 150km park connector, is part of NParks’ overall plans to curate a 360km island-wide network of recreational routes comprising park connectors and trails. When completed, the Round Island Route will be the longest recreational connection in this network. The Park Connector Network (PCN) of Singapore is an island-wide network of linear green corridors linking major parks and nature areas across Singapore. With more than 380 km of trails, the PCN presents a diverse palette of recreational green opportunities, provides avid outdoor enthusiasts with enhanced accessibility to nature spaces across ... Sep 21, 2015 · Sep 21, 2015 06:07 pm. Singapore's Park Connector Network (PCN) reached the length of 300km on Sunday (Sept 20), with the launch of the Central Urban Loop. The 36km route is the fifth loop in the network, which includes the North Eastern Riverine Loop, Eastern Coastal Loop, Northern Explorer Loop and Western Adventure Loop. Learn how to create your own. PCN = Park Connector Network, series of green corridors linking S'pore parks and gardens. Eastern Corridor. The Eastern Corridor is an 18 km route comprising park connectors that have been progressively completed since it was first announced in 2021. Half of the route is located along waterways, including those enhanced under national water agency PUB’s Active, Beautiful, Clean Waters (ABC Waters) Programme, offering park visitors ... In our parks and along our park connectors, you will encounter these types of paths: Shared Path. Red continuous line. Dotted line when approaching attention zone. This is shared by all park users, with a maximum speed of 25km/hr. You may see the path being flanked by red continuous or dotted lines (when users approach an Attention Zone).Dairy Farm Nature Park. •ChoaChuKangMRT Choa Chu Kang Bus Interchange Bus 67 to Dairy Farm Road Walk to park •Commonwealth Ave West entrance Buona Vista MRT …Park Connector Information. Location. Khatib Bongsu Park Connector starts at Yishun Ave 1/ Yishun Ave 2 and runs along Yishun Central and Yishun Ring Road before ending at Yishun Ave 6. Length of Park Connector. 4.5 km.NParks Park Connector Network. Recreational Connectivity. Know Our Recreational Connectivity. Island-wide Routes. Coast to Coast Trail. Eastern Corridor. Rail Corridor. Round Island Route. The Park Connector Experience. Park Connector Network. Explore Park Connectors. NParks Explore A Route Mobile App.Woodlands (Ave 5) Park Connector starts at junction of Woodlands Ave 5 and Woodlands Ave 2 and runs along Woodlands Ave 5 before ending at junction of Woodlands Street 13 and Woodlands Ave 3. Length of Park Connector. 0.6 km. Lighting Hours. 7.00pm-7.00am. Accessibility. Wheelchair friendly. Get Directions. Insert OneMap Link [click here]Park Connector Network (PCN) in Singapore was an integrated approach of Greening and Recreational Strategy. It generated the social and recreational activities in the neighbourhood as well as increased biodiversity within. For example, UluPandan Park Connector was found popularly used. Meanwhile, it also served as habitat for native …The nature park network, which currently covers 350ha, ... Currently, Singapore has 340km of park connectors islandwide. This will be upped to 500km by 2030. With this, ...In all, more than $315 million will be committed to develop the new routes and other projects to expand and enhance parks and the Park Connector Network (PCN) - $80 million on …Ang Mo Kio Park Connector starts at Ang Mo Kio Ave 1 and runs along Ang Mo Kio Ave 6 before ending at Ang Mo Kio St 12. Length of Park Connector. 1.08 km. Accessibility. Wheelchair accessible. Bus Service. 13, 86, 138, 138A, 138B, 162, 162M, 851, 851e, 852, 853, 853M (Bus stop opp Courts AMK) Get Directions.Wayfinding Design. This project started with an observation made while I was strolling in my neighbourhood. I was intrigued by the signages along the Park Connector Network (pcn). Upon extensive research on the history of pcn and Singapore's 'Garden City' motto, I felt that there was room to rejuvenate its current branding and …Park Connector Network Temporary Closures. PCN Loop. Affected Park Connector. Central Urban Loop. Ang Mo Kio Ave 5 Park Connector-25 Apr 2023 to 30 Apr 2028 Works for Land Transport Authority's North-South Corridor project at the junction of Ang Mo Kio Ave 5 Park Connector with Ang Mo Kio Ave 6 have commenced.The entire loop spans 15.6km and will take about 3-4 hours to complete by bicycle at a leisurely pace. For simplicity sake, you can think of this park connector network as a dorrito shaped triangle, with 3 straights lines. Cycling from Toapayoh (Whampoa) to Buangkok. The first line starts at Toa Payoh and ends at Buankok.Updated September 21, 2015. SINGAPORE — The National Parks Board (NParks) marked 25 years of the birth of its Park Connector Network (PCN) with the launch yesterday (Sept 20) of the new Central ...In our parks and along our park connectors, you will encounter these types of paths: Shared Path. Red continuous line. Dotted line when approaching attention zone. This is shared by all park users, with a maximum speed of 25km/hr. You may see the path being flanked by red continuous or dotted lines (when users approach an Attention Zone).Solutions. NParks conceptualized the Park Connector Network in 1990. The network utilizes linear spaces that are too narrow for other uses by converting these into …Enjoy Cycling in East Coastal Park Connector Network (ECPCN), Singapore. The East Coast Park is located on the southeastern coast of Singapore and considered to be the largest park in Singapore. It is one of Singapore's most valued urban get-away. It is entirely built on reclaimed land with an artificial man made beach. This …Park Connector Network Temporary Closures. PCN Loop. Affected Park Connector. Central Urban Loop. Ang Mo Kio Ave 5 Park Connector-25 Apr 2023 to 30 Apr 2028 Works for Land Transport Authority's North-South Corridor project at the junction of Ang Mo Kio Ave 5 Park Connector with Ang Mo Kio Ave 6 have commenced. people visiting the Park Connector Network has grown from 1% in 2006 to 26% in 2011. An earlier survey also revealed an increase in park visits in 2008, a year after the completion of the first Park Connector regional loop, the Eastern Coastal Loop. This suggests that, besides being appealing in their own right, Park Connectors The Park Connector network consists of cycling, waking and running pavements constructed from spaces which are too narrow for to other uses. These footpaths are lined with trees, shrubs and other types of plants to provide a connecting pathway through different heartland parks, nature areas and existing recreational facilities.In our parks and along our park connectors, you will encounter these types of paths: Shared Path. Red continuous line. Dotted line when approaching attention zone. This is shared by all park users, with a maximum speed of 25km/hr. You may see the path being flanked by red continuous or dotted lines (when users approach an Attention Zone).Woodlands (Ave 5) Park Connector starts at junction of Woodlands Ave 5 and Woodlands Ave 2 and runs along Woodlands Ave 5 before ending at junction of Woodlands Street 13 and Woodlands Ave 3. Length of Park Connector. 0.6 km. Lighting Hours. 7.00pm-7.00am. Accessibility. Wheelchair friendly. Get Directions. Insert OneMap Link [click here]Get Routing Directions to Parks, Nature Reserves or Park Connectors. NParks Explore A Route (NEAR) app. Download the NEAR app available on the App Store and Google …Changi Bay Park Connector forms part of the eastern corridor of the Round-Island-Route. At 3.6km long, it connects Changi Beach Park to the East Coastal Park Connector Network. Completed and opened to the public in January 2022, it offers a scenic coastal route for cyclists and hikers who travel from East Coast Park to Changi Beach Park.>.The Park Connector Network has also benefitted wildlife. Surveys of various Park Connectors have turned up a total of 90 species of birds, including the White-throated Kingfisher, Grey Heron and Scaly Breasted Munia; 57 species of butterflies like the Common Mime; and 22 species of dragonflies.Park connectors in Singapore. 1. Changi Bay PC – Seaside route at Changi Bay Point. 2. Kallang PC – IG spots at Bishan-AMK Park. 3. Round Island Route – Iconic Singapore landmarks at Marina Bay. 4. Robertson Quay Loop – Colonial-style architecture at Civic District.Pandan Gardens Park Connector starts at West Coast Road and ends at Ulu Pandan Park Connector Bridge. Length of Park Connector. 0.4 km. Lighting Hours. 7.00pm-7.00am. Accessibility. Wheelchair accessible. Bus Service. 30, 51, 143, 176.The Park Connector Network is an island-wide network of linear open spaces around major residential areas, linking up parks and nature sites in Singapore, allowing everyone to enjoy the splendour of these green spaces. Mature trees are a natural heritage of Singapore and serve as important green landmarks for our island state.Pandan Gardens Park Connector starts at West Coast Road and ends at Ulu Pandan Park Connector Bridge. Length of Park Connector. 0.4 km. Lighting Hours. 7.00pm-7.00am. Accessibility. Wheelchair accessible. Bus Service. 30, 51, 143, 176.Ter Park Joo Chiat Rd g r s a Jln Buroh C l e m e n t i b A v e 1 C l e m e n t i v e 2 C l e m e n t i Bukit Timah Rd A v 4 Jln Buroh Penjuru Rd C m e R R N u t Sunset P a u i a a i Dr u k C r t A v a i Rd Rd Rd S e k n n 8 () (() ()) ((TPE)West Coast Park Connector starts at West Coast Park and runs along West Coast Road before ending at Pandan Gardens Park Connector. Length of Park Connector. 3.1 km. Lighting Hours. 7.00pm-7.00am. Accessibility. Wheelchair accessible. Bus Service. 30, 51, 143, 175, 176, 201.South-siders of Singapore can also rejoice as plans for the Labrador Nature Park Network proceed. By 2024, a 0.4-hectare park at King’s Dock should be ready to welcome you. The opening of the 2-hectare Alexandra Nature Park, 6.5-hectare Berlayer Creek Nature Park, and 7.5-hectare integrated housing park at Keppel will soon follow in …Lornie PC. Located along Lornie Road, the 1.76 km long Lornie Park Connector is part of the Lornie Nature Corridor that comprises a Nature Way, a Park Connector, and abuts the Central Catchment Nature Reserve. Lornie Nature Corridor, which buffers the nature reserve, showcases reclamation of the old Lornie Road for greenery and recreation, …Park Connector Information. Location. Rochor Canal Park Connector starts at Crawford St, runs along the Rochor River and ends where it meets Ophir Road. Length of Park Connector. 2.5km. Accessibility. The park connector is barrier free. Do note that users will have to cross three road junctions.he Park Connector Network is an innovative programme that allows busy Singaporeans to enjoy the outdoors more. Developed by the National Parks Board in cooperation with …Park Connector Information. Location. The Central Catchment Park Connector starts at Mandai Road before ending at Gangsa Trail. Length of Park Connector. 1.9 km. Lighting Hours. Due to its close proximity to the nature reserve, please note that there are no lamp posts along this park connector. Accessibility.5 Serangoon Park Connector 4.2 km 5 Hougang Ave 3 Park Connector 4.4 km 6 Jln Pelikat Park Connector 1.5 km 7 Paya Lebar Park Connector 0.7 km 8 Balam Park Connector 1.2 km 9 Pelton Canal Park Connector 2.5 km 10 Whampoa Park Connector 4.5 km 11 Kallang Park Connector 7.9 km 12 Bishan-Ang Mo Kio Park 1.5 km Discover …Henderson PC. Stretching from Alexandra Road to Telok Blangah Way along Henderson Road, the 1.7 km Henderson Park Connector links Alexandra Park Connector to Tiong Bahru Park, Mount Faber Park and Telok Blangah Hill Park. It runs through schools such as Gan Eng Seng Secondary School before ending at SAFRA Clubhouse (Mt Faber).Sep 21, 2015 06:07 pm. Singapore's Park Connector Network (PCN) reached the length of 300km on Sunday (Sept 20), with the launch of the Central Urban Loop. The 36km route is the fifth loop in the network, which includes the North Eastern Riverine Loop, Eastern Coastal Loop, Northern Explorer Loop and Western Adventure Loop.Punggol Park Connector starts at Gerald Drive and runs along Punggol Reservoir and Straits of Johor before ending at Punggol Promenade. Length of Park Connector. 6.1 …The Park Connector Network (PCN) is a network of linear green corridors that links major parks and nature areas across the island. There are currently more than 30km of trails …HOW TO GO CHANGI BAY PCN. The easiest way to go to Changi Bay Park Connector is by taking public transportation. Head to Bedok MRT Station or Tanah Merah MRT Station, then ride Bus No. 35 located opposite of the station. Alight after 10 stop at bus stop Bef Changi Ferry Rd. From here walk for about 5 minutes to the entrance of the park …NParks will strengthen the connectivity between Singapore’s pockets of green spaces through the Park Connector Network and the Nature Ways. There are currently 340 kilometres of park connectors, and Singapore will …

These areas will be protected to strengthen the connectivity between the Central Nature Park Network and Tengah Forest Corridor. Altogether, the Bukit Batok Nature Corridor will comprise more than 125 hectares of nature parks and 10km of trails that will serve as ecological connectors, as well as nature ways and park connectors.. Flights from sfo to london

park connector network

In fact, the park connector network covers a distance of over 300 kilometres, all managed by the National Parks Board. The park connector network is simple and effective, and perfect for a relaxed day outdoors. And we’ve compiled a list of the five park connector loops in Singapore that you must explore over the weekend. The Park Connector Network (PCN) is designed to be easily accessible from various parts of Singapore. Most connectors are linked to major residential areas, MRT stations, and bus stops, making them highly accessible via public transport. For those driving, parking is available near major parks and connectors.About Our PCN. A large interlinking network of Park Connectors, you can easily park hop while indulging in various fun and recreational activities. Read More. Island-wide Routes. Recreational Connectivity. Island-wide …Park Connector Network Temporary Closures. PCN Loop. Affected Park Connector. Central Urban Loop. Ang Mo Kio Ave 5 Park Connector-25 Apr 2023 to 30 Apr 2028 Works for Land Transport Authority's North-South Corridor project at the junction of Ang Mo Kio Ave 5 Park Connector with Ang Mo Kio Ave 6 have commenced.Park connectors in Singapore. 1. Changi Bay PC – Seaside route at Changi Bay Point. 2. Kallang PC – IG spots at Bishan-AMK Park. 3. Round Island Route – Iconic Singapore landmarks at Marina Bay. 4. Robertson Quay Loop – Colonial-style architecture at Civic District.Dairy Farm Nature Park. •ChoaChuKangMRT Choa Chu Kang Bus Interchange Bus 67 to Dairy Farm Road Walk to park •Commonwealth Ave West entrance Buona Vista MRT Walk along Commonwealth Ave West Cross traffic junction at Vista Exchange Green and Commonwealth Ave West Walk to park connector Boon Lay Way entrance (towards …The Friends of Park Connector Network (FoPCN) was formed in 2016. FoPCN riding a section of the Round Island Route to the launch of Rower’s Bay and the NParks Coast …Winding through the housing estates of Circuit Road along Pelton Canal, Balam Park Connector serves as a recreational corridor for the nearby residents. You can observe the beauty of the Rain Garden, a project by PUB, along the park connector and also enjoy a wide variety of local fare from the renowned Circuit Road Food Centre at Blk 79, which is … Park Connector Information. Location. Siglap Park Connector starts from Area C4 in East Coast Park, running across Marine Parade Road, East Coast Road, Changi Road, Sims Avenue East, Bedok North Road before ending at Bedok Reservoir Road. Length of Park Connector. 7.6 km. Accessibility. Over-head bridge across Bedok North Road has no ramp but ... Use the journey planner on OneMap to plan your route, whether it is by car, public transport, or by bicycle. You can also explore our green spaces such as the Coast-to-Coast Trail or the Round Island Route using the NParks Explore A Route (NEAR) mobile application. Get Routing Directions to Parks, Nature Reserves or Park Connectors. Adaptable Signage Grid-System. Inspired by form over function, Adaptable Signage Grid-System serves as a guide for a flexible and consistent signage design. Each section of the signage is designed to be modular and tiled in square grids. Its modularity and hassle-free assembly initiate easy maintenance without replacing the entire signage. Jun 13, 2019 · What is Park Connector Network (PCN)? There are plenty of gardens, parks, nature reserves, and heritage roads within the city-state island of Singapore. To make all these places easier to access while walking, jogging, or riding a bike, they created an interlinking network of park connectors called Park Connector Network or simply PCN. Park Connector Network; Parks & Nature Reserves; Links you may like. Visit NParksSG, our YouTube channel There's something for everyone, ranging from videos on DIY ... The Round Island Route (RIR), a continuous 150km park connector, is part of NParks’ overall plans to curate a 360km island-wide network of recreational routes comprising park connectors and trails. When completed, the Round Island Route will be the longest recreational connection in this network. In fact, the park connector network covers a distance of over 300 kilometres, all managed by the National Parks Board. The park connector network is simple and effective, and perfect for a relaxed ... Park Connector Information. Location. Bukit Batok East Park Connector starts at Bukit Batok East Ave 2. It runs along Bukit Batok East Ave 5 before ending at Bukit Gombak MRT. Length of Park Connector. 1.5 km. Lighting Hours. 7.00pm-7.00am..

Popular Topics